Challenges
T&R Engineering was allowed to provide and participate in additional and complementary construction designs to the main contractor for the construction and quantification of the bridges:
1-Barton Creek with 8m of Span.
2-Privassion Creek 24m Span.
3-Oak Burn Creek 35m Span.
4-Pinol Creek 90.650m.
Lead engineers faced many challenges working on the value engineering of the bridges. The execution is developed with the help of a constant flow of construction drawings made by our representative.
Description
Planning
T&R’s
T&R ensured that the forty-three cross culverts were placed in the most effective and efficient positions and locations and that the inlets and outlets in unfavorable environmental conditions worked, including that of the four bridges.
That the thirty-three kilometers of highway, divided into three Lots, will have quality longitudinal drainage capable of moving the water along the road to the culverts to guarantee the longevity of the built infrastructure.
THE REQUIREMENTS
As a client of T&R Engineering Ltd., you will enjoy the creative and well-structured approach and be able to recognize the expertise of the well-trained team easily. By the time we start to deliver your engineering service. You will already be confident and excited about the results.
Your project will be delivered within a timeframe and to the required specification or beyond, and you’ll love the human level of care applied to the work being completed.
Throughout and beyond the working relationship with our team, you will find that you are appreciated, valued, and well-supported, meaning that you will gain confidence through experience.
Embedded in our culture of hard work and honesty to get the job well-done, our team’s history not only tells much about our past but it also shows how we conduct in our present. Our record of succeeding, surviving, and striving to be the best is central to our reputation today.